PipePatch Pillow
- LARGE DIAMETER PIPE SOLUTION: Creates structural repairs from 15"-72"
- COST EFFECTIVE: Avoid costly and disruptive excavations and replacements
- FLEXIBLE: Easily navigate within pipes and through conditions
- ENVIRONMENTALLY SAFE: Safe for storm and sewer systems
Product Description
The PipePatch Pillow system enables large diameter CIPP rehabilitation repairs, without removing/excavating any part of the manhole or catch basin. The Pillow is extremely flexible, allowing the installer the ability to complete repairs through most manholes and pipes up to 72". Ideal for storm and sewer rehabilitation such as Department of Transportation drains, railway culverts and interceptors.
Technical Data
Average Tensile Strength: 24,500 psi
Average Flexural Strength: 27,500 psi
Average Flexural Modulus: 1,345,000 psi
Environmentally Friendly
Contains NO VOCs
Resistance to 63+ Chemicals and Oils
Non-flammable & Non-hazardous
Application Advantages
Fast Cure Times and Easy Installation
Creates Structural Repair
Eliminates Infiltration
Flow-through Pillow Packer
Avoid disruptions in the underground system with the use of a flow though packer.
Pillow Repair System Regulator
The integrated fast fill valve bypasses regulator to reduce inflation time. Completely deflates a 72" Pillow Packer in as little as 18 minutes.